Introduction to the Installation Process of Chicken Manure Organic Fertilizer Dryer1, Scribe the basic line: make a reasonable cross line on the base plate, design the elevation line, the center plate laying should be convenient to use, accurate and take into account the shaft seat is not covered after installation.
2, Installation of base and drag wheel: push the leveling pad parts, scratch to the axis of base and drag wheel, select the installation parts of base and drag wheel in accordance with the engineering drawings, adjust and place the square, grout the basic hole first, when the concrete reaches a certain hardness, twist the foot screw, and then install the head of gravel dryer after the rediagnosis reaches the standard.
3, Installation of head and roller ring: first install the roller ring on the cylinder body, fixed immobile when the concave joint head needed to be a positive and a negative overlapping equipped, and adjust the thin thickness of the gasket, so that the touch of the roller ring and concave joint head to maintain the relative gap, do not be consistent, and weld the top of the concave joint head foot bolt head with the cylinder body.
4, Installation of large gear: check that there is no impact mark on the connection surface socket before installation, wipe the surface layer of large gear and head touching clean, then put the two gears in good alignment and tighten the socket foot bolt, and put the large gear on the head. Rotate the head and check the tangential chattering and side shaking of the big gear until the calibration is up to standard.
5, Installation of pinion, reducer and motor: According to the installed large gear, adjust the main parameters of the tooth fit of the large and small gears and do the requirements of the machine and equipment, fix the part of the immobile pinion and reducer motor.
6, Installation of gear cover: so that it is evenly spaced with the edges of the gear.
The above is the introduction of the installation process of cow manure organic fertilizer dryer, Sande Machinery equipment tips, all of the above work to do after the second grouting, the standard of grouting should be carried out in accordance with the relevant requirements of the civil engineering design program. Installation review related to grouting, adjust the work at the same time to ensure the installation quality of cow manure organic fertilizer dryer.